Item No: |
BS304 |
Description: |
Kitchen Cleaning Brush |
Material: |
PP |
Color: |
Green, pink, beige, or customized |
Size: |
27*9cm |
Usage |
for cleaning pot, pan, dish, bottle, sink, etc |
Package: |
sticker, or hangtag, or customize |
MOQ: |
5000pcs |
Samples time: |
5-7 working days (1-2 working days if stock) |
Delivery date: |
25-35 days |
Delivery way: |
By sea, By air, By train |
Features:
* Durable: Made of high-quality PP material, soak in hot water before use, the bristles have strong toughness.
* Quick and Easy: The brush and dustpan handle are ergonomically designed with a comfortable grip.
* Loop handle: Dish washing brush scrubber with loop long handle can be hung over the sink to keep dry and clean.
* Multipurpose: Ideal for cleaning bottle, cup, pot, pan, cast Iron skillet, sink, bathroom and fixtures., etc.
PP bristles have high elasticity and will not scratch the surface. |
Long bristles and big brush head can capture and move dirt effectively |
Ergonomical design makes the cleaning more convenient. |
Company Profile:
FAQ:
1. Why choose us?
1): Reliable---we are the real company, we dedicate in win-win cooperations
2): Professional---we offer the pet products exactly you want
3): Factory---we have factory, so have reasonable price
2.Regarding free samples?
Sample is free of charge for our exsit mold. If need to open new mold, cost shall bear on clients' side.The express cost is on buyer's account.
Shipping ways: EMS, DHL, FedEx, UPS, TNT, China Post etc.
3. Could you offer lower MOQ?
Yes, pls contact us with needed quantity, we can discuss.
4.How about the price? Can you make it cheaper?
The price depends on the item your demand(Shape,size,quantity)
Beat quotation after receving full description of the item you want.
5.What is the trade terms and payment terms?
Trade terms: FOB,CFR,CIF etc .
Payment terms : T/T - 30% as deposit , 70% against BL copy.
6.How about the lead times?
Honestly, it depends on the order quantity and the season you place the order.
Normally,the delivery time will be around 25-35 days